Skip to content
Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·
Services · Vol. I

Six services. One studio.

Whether you're collecting rent, housing aging parents, or finally building the office you've been promising yourself — there's a path here that fits.

  • 01From $245K

    Detached ADUs

    Standalone backyard cottages, 400–1,200 sq ft. Standard plans or custom drawn for your lot.

    $ / sq ft
    $300–$425
    Permit
    14–22 wk
    Build
    5–7 mo

    What's included

    • Site survey, soils, and feasibility brief
    • Architectural + structural + Title 24 engineering
    • Foundation, framing, envelope, MEP rough-in
    • Cabinetry, finish, fixtures, appliances
    • Landscape repair, final inspection, C of O
    Inquire about detached adus →
  • 02From $155K

    Garage Conversions

    The fastest path to permitted rental income — usually 4–6 months from contract to keys.

    $ / sq ft
    $180–$275
    Permit
    10–16 wk
    Build
    4–6 mo

    What's included

    • Existing structure assessment + reframe plan
    • Insulated envelope, new windows + skylights
    • Full kitchen, bath, and laundry build-out
    • Sub-panel + utility upgrade as required
    • Permit closeout and short-term-rental compliance review
    Inquire about garage conversions →
  • 03From $120K

    Junior ADUs (JADUs)

    Interior conversion within the main house. Up to 500 sq ft, private entry, kitchenette.

    $ / sq ft
    $210–$310
    Permit
    8–12 wk
    Build
    3–5 mo

    What's included

    • Interior reconfiguration of existing primary home
    • Efficiency kitchen + dedicated entrance
    • Optional shared-bathroom layout for owner-occupancy
    • Plan check + inspection management
    • Owner-occupancy affidavit support
    Inquire about junior adus (jadus) →
  • 04From $185K

    Attached Additions

    Second-story or rear additions that share a wall with the main residence.

    $ / sq ft
    $260–$400
    Permit
    12–20 wk
    Build
    5–8 mo

    What's included

    • Architectural integration with existing home
    • Structural stitch + matched roofing / siding
    • Mechanical, plumbing, and electrical extensions
    • Interior finishes matched to primary residence
    • Coordination with any in-place soft-story retrofit
    Inquire about attached additions →
  • 05From $215K

    Full Home Renewals

    Whole-house remodels paired with a new ADU on the same parcel.

    $ / sq ft
    $285–$355
    Permit
    8–12 wk
    Build
    5–6 mo

    What's included

    • Selection from six LADBS pre-approved plans
    • Site adaptation, setback verification
    • Stamped construction set + permit submittal
    • Fixed-fee build with finish-tier upgrades
    • Standardized 4-week shorter delivery vs custom
    Inquire about full home renewals →
  • 06From $8.5K

    Permitting & Feasibility

    Standalone consulting if you've already got plans — LADBS, Coastal, HPOZ, you name it.

    $ / sq ft
    Fee-based
    Permit
    Variable
    Build

    What's included

    • Site feasibility + zoning brief (1 business day)
    • Schematic design package + 3D massing
    • LADBS plan check management end-to-end
    • Coordination with homeowner-selected GC
    • Inspections + Certificate of Occupancy closeout
    Inquire about permitting & feasibility →

The studio rules

Four commitments behind every engagement.

  1. 01

    Fixed-fee feasibility, one business day

    Every engagement starts with a hardened cost + zoning + timeline brief — not an estimate range you can't act on.

  2. 02

    One-team design + build

    Architecture, engineering, plan check, and construction live under one P&L. No coordination tax, no finger-pointing on corrections.

  3. 03

    Real cost transparency

    Line-item budget at contract, weekly burn report during build, and a hard contingency we don't touch silently.

  4. 04

    Bonded, insured, CSLB-licensed

    CSLB #1098432. General liability, workers' comp, and an auto-renewing performance bond available on request.

FAQ

Frequently asked questions

What homeowners ask before booking a feasibility on one of our six services.

  1. Which service is right for my lot?
    Detached ADUs maximize value when you have 1,200+ sq ft of clear yard. Garage conversions are the fastest path if your existing garage is permitted and structurally sound. JADUs work when you want rental income without giving up backyard space. We confirm the right fit during the one-business-day feasibility review.
  2. How long does the full design-build process take?
    Permit timelines run 8–22 weeks depending on jurisdiction and service type. Construction adds another 3–8 months. End-to-end, plan on 6–12 months from contract to certificate of occupancy for a detached ADU, and 4–7 months for a garage conversion or JADU.
  3. Do you handle the permits and plan check?
    Yes — every engagement includes architectural, structural, Title 24, and LADBS plan-check management end-to-end. We submit, track, and clear corrections under one P&L so you don't coordinate between separate firms.
  4. Are you licensed, bonded, and insured?
    CSLB #1098432. We carry general liability, workers' compensation, and an auto-renewing performance bond available on request. License and insurance certificates are shared at contract signing.
  5. Can I use my own architect or contractor for part of the project?
    Our permitting & design service (No. 06) is fee-based and supports homeowner-selected GCs. The other five services run as integrated design-build under one contract — that's where the cost certainty and schedule discipline come from.
  6. How does pricing compare to other LA design-build firms?
    Our published starting prices and per-sq-ft bands sit mid-market — we're not the cheapest bid and we don't try to be. The savings show up in fewer change orders, on-time delivery, and a hard contingency we don't quietly draw down.