Skip to content
LIVE · Studio ·Vol. I ·California Residential Design-Build ·ADUs · Custom Homes · Multifamily ·License & insurance details on request ·CSLB #1156772 ·Starting $250K ·10–16% ROI ·San Francisco · HQ ·Bay Area ·Los Angeles ·LIVE · Studio ·Vol. I ·California Residential Design-Build ·ADUs · Custom Homes · Multifamily ·License & insurance details on request ·CSLB #1156772 ·Starting $250K ·10–16% ROI ·San Francisco · HQ ·Bay Area ·Los Angeles ·
Desk 01 · HQ · Bay Area · New construction

Bay Area New Home Construction. ground-up, engineered.

We build new single-family homes from the ground up across the Bay Area — custom architecture on Peninsula hillside lots, infill new construction on flat East Bay parcels, and small residential developments (2–6 units) under SB-9 and local zoning.

Licensed California contractor · CSLB #1156772 · Bay Area desk · city-by-city review

About New Home Construction in Bay Area

Every project is design-build: architecture, structural, MEP, civil, city permits, construction, landscape, closeout — single contract. Typical project size $1.4M–$5M+.

Bay Area permit notes · New Construction

What we resolve before drawings begin.

  • 01

    City plan check + civil + design review

    Full city plan check, civil drawings, grading permit, and (often) design review board engagement. We coordinate the set.

  • 02

    Title 24 + CALGreen + reach codes

    Many Bay cities have local reach codes above Title 24 (all-electric, EV-ready, solar). We design to them from day one.

  • 03

    Geotech + drainage

    Every new build = soils + drainage. Hillside builds = caissons + slope stability.

ADU intel · the build stack we ship · Bay Area spec

A 2025 LA detached ADU is 12–16 weeks of construction over 6–9 months of permit and design. The fastest path is the pre-approved-plan path — when the design fits.

The manufacturers we actually specify.

  • ZIP System (Huber)

    premium

    USA

    Structural sheathing with integrated weather barrier

    Eliminates a separate WRB step + tape system catches install errors visually. Our preferred default on ADU walls and roof decks.

  • Mitsubishi / Daikin / LG

    premium

    Japan · Japan · Korea

    Mini-split heat pumps for ADU HVAC

    Right-sized inverter heat pumps hit Title 24 and CalGreen with zero ductwork — the cleanest, cheapest HVAC for an ADU < 1,000 sf.

  • Rinnai / Navien

    workhorse

    Japan · Korea

    Tankless water heaters

    Wall-mount tankless saves 9 sq ft of floor and qualifies for SoCalGas rebates when CSA-approved gas units are still permitted; we switch to heat-pump electric where local code requires.

  • Square D / Eaton

    workhorse

    USA

    Sub-panel + load center for ADU service

    Standard 100A or 125A sub-panel from main; tap conductor sizing per CEC 705.12(B).

Material tiers · what you're actually choosing between.

MaterialLifespanInstalled in CABest forTrade-offs
2x6 stick-frame on continuous footing75+ years$340–$520 / sq ft turnkeyMost LA infill ADUs.12–16 weeks construction once permits issue.
Panelized / off-site framing kit75+ years$320–$480 / sq ftTight side-yard sites or fire-rebuilds.Crane access required; not feasible on every lot.
Modular box (Abodu / Cover / Boxabl)50+ years$300–$500 / sq ft delivered + siteworkOwners who want speed and accept the design constraint.Crane + crane-truck access required; foundation still has to be poured first.

Specification gotchas we resolve before contract.

  1. 01

    Pre-approved plans (LA + city catalogs).

    LA City, Santa Monica, Pasadena, Long Beach all maintain pre-approved plan catalogs. Plan check drops to 30 days or less when the plan is in the catalog.

  2. 02

    Utility separation (SB 9 / AB 2221 nuance).

    Separate utility meters are no longer required to permit, but they're often required for refinance or sale. We pull the right meter strategy for the owner's exit plan.

  3. 03

    Fire setbacks + sprinklers.

    ADUs under 1,200 sf often don't trigger sprinklers; over 1,200 or with specific roof tie-ins, NFPA 13D applies.

Sources · CA HCD ADU handbook (2025) · LADBS ADU information bulletin

Other Bay Area services.

All Bay Area services →

Bay Area city directory · 172 cities served

New Home Construction, written for your city.

Each link opens a dedicated page calibrated to the city's permit authority, lot conditions, and price band — not a generic regional landing.

Bay Area · New Construction FAQ

Questions Bay Area homeowners ask first.

Start a Bay Area new construction brief. We'll review the lot, engage architecture + soils, and write a design-build contract.

  1. What does Bay Area new construction cost?
    Typical custom single-family $700–$1,200 per sq ft all-in. Peninsula, hillside, and high-finish exceed this.
  2. How long does it take?
    Brief-to-keys typically 26–42 months: 8–12 months design + permit, then 18–30 months construction.
  3. Do you do small developments?
    Yes — 2–6 unit small residential under SB-9 lot splits, duplex / triplex infill, small townhouses.
  4. Can I tear down and rebuild on my Bay Area lot?
    Usually yes. We confirm zoning, FAR, height limits, and any historic or design-review overlays during feasibility before signing the design-build contract.
  5. Do Bay cities require all-electric or reach-code construction?
    Many do — Berkeley, San Jose, Palo Alto, and others have reach codes above Title 24 (all-electric, EV-ready, solar). We design to the local reach code from day one, not retrofit at permit.
Begin

Begin your projectin twenty minutes.

A short feasibility review of your lot — what you can build, roughly what it costs, and how long it will take. Free of charge. No sales call afterwards unless you ask for one.

  • No obligation
  • Reply within 24 hours
  • License & insurance on request
§ Bay Area · New Construction

New Construction in Bay Area. Tell us the parcel.

New Construction runs differently in every Bay Area jurisdiction. Send your address and we'll come back with the city-specific path, the realistic timeline, and an honest all-in.

  • New Construction approval rate by city in Bay Area
  • Realistic week-by-week timeline
  • All-in cost banded to your zip
  • 240
    California builds
  • 4 hr
    Avg reply today
  • $0
    For the brief
A principal is online · Replies todayNo spam · Unsubscribe anytime