Skip to content
LIVE · Studio ·Vol. I ·California Residential Design-Build ·ADUs · Custom Homes · Multifamily ·License & insurance details on request ·CSLB #1156772 ·Starting $250K ·10–16% ROI ·San Francisco · HQ ·Bay Area ·Los Angeles ·LIVE · Studio ·Vol. I ·California Residential Design-Build ·ADUs · Custom Homes · Multifamily ·License & insurance details on request ·CSLB #1156772 ·Starting $250K ·10–16% ROI ·San Francisco · HQ ·Bay Area ·Los Angeles ·
Desk 02 · Los Angeles · New construction

Los Angeles New Home Construction. build it from the ground up.

We build new single-family homes from the ground up across LA County — custom architecture on hillside lots in the Palisades, infill new construction on flat South Bay parcels, and small residential developments (2–6 units) in Mid-City and the East Side.

Licensed California contractor · CSLB #1156772 · Los Angeles desk · LADBS

About New Home Construction in Los Angeles

Ground-up work is design-build under one contract: architecture, structural, MEP, civil, LADBS permits, construction, landscape, and closeout. Typical project size $1.2M–$4M+.

Los Angeles permit notes · New Construction

What we resolve before drawings begin.

  • 01

    Full LADBS plan-check + civil

    New construction triggers full LADBS plan-check, civil drawings, grading permit (on sloped lots), and often coastal or hillside review. We coordinate the full set.

  • 02

    Title 24 + CALGreen

    California energy and green-building codes are non-trivial on new construction. We design to them from day one, not retrofit at permit.

  • 03

    Soils, drainage, geotech

    Every new build needs a soils report and engineered drainage. Hillside builds need geotech + caissons + slope stability.

ADU intel · the build stack we ship · Los Angeles spec

A 2025 LA detached ADU is 12–16 weeks of construction over 6–9 months of permit and design. The fastest path is the pre-approved-plan path — when the design fits.

The manufacturers we actually specify.

  • ZIP System (Huber)

    premium

    USA

    Structural sheathing with integrated weather barrier

    Eliminates a separate WRB step + tape system catches install errors visually. Our preferred default on ADU walls and roof decks.

  • Mitsubishi / Daikin / LG

    premium

    Japan · Japan · Korea

    Mini-split heat pumps for ADU HVAC

    Right-sized inverter heat pumps hit Title 24 and CalGreen with zero ductwork — the cleanest, cheapest HVAC for an ADU < 1,000 sf.

  • Rinnai / Navien

    workhorse

    Japan · Korea

    Tankless water heaters

    Wall-mount tankless saves 9 sq ft of floor and qualifies for SoCalGas rebates when CSA-approved gas units are still permitted; we switch to heat-pump electric where local code requires.

  • Square D / Eaton

    workhorse

    USA

    Sub-panel + load center for ADU service

    Standard 100A or 125A sub-panel from main; tap conductor sizing per CEC 705.12(B).

Material tiers · what you're actually choosing between.

MaterialLifespanInstalled in CABest forTrade-offs
2x6 stick-frame on continuous footing75+ years$340–$520 / sq ft turnkeyMost LA infill ADUs.12–16 weeks construction once permits issue.
Panelized / off-site framing kit75+ years$320–$480 / sq ftTight side-yard sites or fire-rebuilds.Crane access required; not feasible on every lot.
Modular box (Abodu / Cover / Boxabl)50+ years$300–$500 / sq ft delivered + siteworkOwners who want speed and accept the design constraint.Crane + crane-truck access required; foundation still has to be poured first.

Specification gotchas we resolve before contract.

  1. 01

    Pre-approved plans (LA + city catalogs).

    LA City, Santa Monica, Pasadena, Long Beach all maintain pre-approved plan catalogs. Plan check drops to 30 days or less when the plan is in the catalog.

  2. 02

    Utility separation (SB 9 / AB 2221 nuance).

    Separate utility meters are no longer required to permit, but they're often required for refinance or sale. We pull the right meter strategy for the owner's exit plan.

  3. 03

    Fire setbacks + sprinklers.

    ADUs under 1,200 sf often don't trigger sprinklers; over 1,200 or with specific roof tie-ins, NFPA 13D applies.

Sources · CA HCD ADU handbook (2025) · LADBS ADU information bulletin

Other Los Angeles services.

All Los Angeles services →

Los Angeles city directory · 314 cities served

New Home Construction, written for your city.

Each link opens a dedicated page calibrated to the city's permit authority, lot conditions, and price band — not a generic regional landing.

Los Angeles · New Construction FAQ

Questions Los Angeles homeowners ask first.

Start an LA new construction brief. We'll review the lot, engage architecture + soils, and write a design-build contract.

  1. What does new construction cost in LA?
    Typical custom single-family new construction in LA runs $550–$1,000 per square foot all-in. Hillside, coastal, and high-finish projects exceed this.
  2. How long does it take?
    Brief-to-keys is typically 22–36 months: 6–9 months design + permit, then 16–24 months construction.
  3. Do you do small developments?
    Yes — 2–6 unit small residential developments (SB-9 lot splits, duplex / triplex infill, small townhouses) across LA.
  4. Can I tear down and rebuild on my existing LA lot?
    Usually yes. We confirm zoning, height limits, lot coverage, and any historic or HPOZ overlays during feasibility before signing the design-build contract.
  5. Do you handle architecture in-house?
    Yes — design-build means architecture, structural, MEP, civil, and construction sit under one contract with one accountable team, instead of bidding plans out to a low-bid GC.
Begin

Begin your projectin twenty minutes.

A short feasibility review of your lot — what you can build, roughly what it costs, and how long it will take. Free of charge. No sales call afterwards unless you ask for one.

  • No obligation
  • Reply within 24 hours
  • License & insurance on request
§ Los Angeles · New Construction

New Construction in Los Angeles. Tell us the parcel.

New Construction runs differently in every Los Angeles jurisdiction. Send your address and we'll come back with the city-specific path, the realistic timeline, and an honest all-in.

  • New Construction approval rate by city in Los Angeles
  • Realistic week-by-week timeline
  • All-in cost banded to your zip
  • 240
    California builds
  • 4 hr
    Avg reply today
  • $0
    For the brief
A principal is online · Replies todayNo spam · Unsubscribe anytime