Skip to content
Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·
Desk 01 · Los Angeles · ADU design-build

Los Angeles ADU Builder. purpose-built for LA lots.

We design, permit, and build detached ADUs and backyard homes across Los Angeles County — Silver Lake, Mar Vista, Pasadena, Beverly Hills, Santa Monica, Burbank, Glendale, Culver City, Long Beach, and the unincorporated county.

Licensed California contractor · CSLB #1098432 · Los Angeles desk · LADBS

About ADU Builder in Los Angeles

Every LA lot carries its own LADBS plan-check pattern. Hillside overlays, coastal review zones, R1 versus R2 lots, alley access, and aging sewer laterals all change what your ADU costs and how fast it gets built. We walk yours before drawings begin so the scope holds up through permit, construction, and rental.

Our LA ADU work is a fixed-scope contract: feasibility, design, permits, construction, and closeout — with weekly homeowner updates and a single point of accountability from brief to keys.

Los Angeles permit notes · ADU Builder

What we resolve before drawings begin.

  • 01

    LADBS plan-check first

    We run feasibility against LADBS, LA County, and your jurisdiction's small-lot rules before the brief is signed. No surprises after deposit.

  • 02

    Setbacks, hillside, and alley access

    Hillside lots and rear-loaded alleys behave differently than flat R1 parcels. We confirm setbacks, fire separation, and access during the feasibility brief.

  • 03

    Sewer, water, and panel capacity

    Older LA neighborhoods often need lateral upgrades or a panel upsize before an ADU connects. We scope this up front so it lives in the contract, not in a change order.

Other Los Angeles services.

All Los Angeles services →

Los Angeles · ADU Builder FAQ

Questions Los Angeles homeowners ask first.

Start a Los Angeles ADU feasibility brief. We'll map LADBS plan-check, setbacks, utility upgrades, and rental income against your specific address before any drawings begin.

  1. How long does a Los Angeles ADU take from brief to keys?
    Typical LA ADU projects run 11–15 months: feasibility and design (2–3 months), LADBS plan-check (3–5 months), and construction (5–7 months). Hillside, coastal, and historic overlays add time.
  2. What does an LA detached ADU cost?
    Most LA detached ADUs we build land between $300K and $550K all-in, depending on size, finish, hillside conditions, and utility upgrades. Garage conversions typically run lower.
  3. Do I need LADBS approval for an ADU?
    Yes — every LA City ADU goes through LADBS plan-check. Unincorporated LA County and contract cities (Beverly Hills, Santa Monica, Pasadena, etc.) have their own building departments with similar but distinct workflows.
  4. Can I rent my LA ADU on Airbnb?
    Most LA jurisdictions restrict short-term rentals on ADUs and require 30-day minimum stays for the unit to count as long-term housing. We'll review your address's specific rules during feasibility.
  5. How much rental income can I expect from an LA ADU?
    Westside and South Bay LA ADUs commonly rent for $2,800–$4,500/month for 1BR units, depending on neighborhood, finish, and parking. We model the actual rent during the feasibility brief.
  6. Do you handle the entire LA ADU project?
    Yes — feasibility, architecture, structural, MEP, LADBS permitting, construction, finals, and closeout sit under one fixed-scope contract.
Begin

Begin your projectin twenty minutes.

A short feasibility review of your lot — what you can build, roughly what it costs, and how long it will take. Free of charge. No sales call afterwards unless you ask for one.

  • No obligation
  • Reply within 24 hours
  • BBB A+ Accredited