Skip to content
LIVE · Studio ·Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·LIVE · Studio ·Vol. I ·California ADU Desk ·Licensed · Bonded · Insured ·CSLB #1098432 ·BBB A+ Accredited ·120+ ADUs Delivered ·Starting $250K ·10–16% ROI ·Los Angeles ·Bay Area ·
Desk 02 · Bay Area · Seismic retrofit

Bay Area Seismic Retrofit Contractor. before the next quake, not after.

The Bay Area's seismic risk is well known — and the City of San Francisco's Mandatory Soft-Story Program has already put thousands of buildings under retrofit deadline. Berkeley and Oakland have parallel programs. We design and install seismic retrofits across the Bay: cripple-wall bracing, foundation bolting, soft-story moment frames and steel cantilever columns, and shear wall upgrades.

Licensed California contractor · CSLB #1098432 · Bay Area desk · city-by-city review

About Seismic Retrofit in Bay Area

We work with structural engineers specialized in the Bay's retrofit code paths, and we coordinate with tenants on occupied multifamily soft-story work.

Bay Area permit notes · Seismic Retrofit

What we resolve before drawings begin.

  • 01

    SF Mandatory Soft-Story Program

    If DBI sent you a notice, you have a deadline. We work within SF's defined retrofit code path.

  • 02

    Cripple wall + foundation bolting

    Pre-1940 single-family Bay homes: bolt mudsill, brace cripple walls with structural plywood. Highest-ROI seismic upgrade you can make.

  • 03

    Tenant coordination on multifamily

    Soft-story on apartments is phased so tenants stay in place. We manage notice, parking, access.

Other Bay Area services.

All Bay Area services →

Bay Area · Seismic Retrofit FAQ

Questions Bay Area homeowners ask first.

Start a Bay Area seismic retrofit brief. We'll review the notice (if any), engineer the upgrade, and write a fixed-scope contract.

  1. Does my SF building need a soft-story retrofit?
    If DBI sent you a notice — yes. Generally: pre-1978 wood-frame multifamily with parking or commercial ground floor. We can verify your address.
  2. What does a soft-story retrofit cost?
    Most SF soft-story retrofits $90K–$300K depending on size, frame, and restoration.
  3. Single-family cripple wall + bolting?
    $6K–$20K typically. CEA Brace + Bolt grant often available.
  4. How long does a Bay soft-story retrofit take?
    Most multifamily soft-story projects run 10–18 weeks on site after permit. Single-family cripple-wall and foundation bolting is typically 1–2 weeks.
  5. Can tenants stay during a Bay Area soft-story retrofit?
    Yes — we phase the work so tenants remain in place. Most retrofit work is at the parking level or perimeter cripple walls, not inside occupied units.
Begin

Begin your projectin twenty minutes.

A short feasibility review of your lot — what you can build, roughly what it costs, and how long it will take. Free of charge. No sales call afterwards unless you ask for one.

  • No obligation
  • Reply within 24 hours
  • BBB A+ Accredited